Gigs — Logan 21 rows

CityStatusTypeCritical SupervisorCrewAge (days) CreatedComments
Logan OPEN Conduit_Length No 879390 GTO 56 2026-05-04 Trim conduit to 3-6 inches
Logan OPEN Conduit_Length No 879390 GTO 56 2026-05-04 Trim conduit to 3-6 inches
Logan OPEN Conduit_Length No 879390 GTO 49 2026-05-11 trim conduit to 3-6 inches
Logan OPEN Structure_Tracer_Wire No 879390 GTO 47 2026-05-13 Strip tracer wire and attach it to the ground wire with a wire nut.
Logan OPEN Conduit_Entry No 879390 GTO 47 2026-05-13 Expose stubbout to vault
Logan OPEN Structure_Gravel No 873612 Alpha One 26 2026-06-03 remove vault and place a 6 inches barrier of gravel for the vault. Replace it and add gravel inside the vault.
Logan OPEN Structure_Tracer_Wire No 873612 Alpha One 21 2026-06-08 Strip 7 way and attach it to the ground wire with a wire number. ( You can use a regular tracer and attach it as an extension of the 7 way.
Logan OPEN Locate_Isolation_Switch No 879390 GTO 20 2026-06-09 install isolation switch. Strip tracer wires and attach them to the isolation switch. Attach the Ground wire to the isolation switch.
Logan OPEN Conduit_Entry No 873612 Alpha One 14 2026-06-15 expose stubbout to vault.
Logan OPEN Restoration_Trench No 879390 GTO 14 2026-06-15 Fill trench hole with flow fill.
Logan OPEN Restoration_Trench No 879390 GTO 14 2026-06-15 Fill hole in trench with flowfill.
Logan OPEN Restoration_Trench No 879390 GTO 14 2026-06-15 Fill hole in trench with flow fill.
Logan OPEN Restoration_Trench No 879390 GTO 14 2026-06-15 Fill hole in trench with flow fill.
Logan OPEN Structure_Tracer_Wire No 873612 Alpha One 12 2026-06-17 strip tracers and attach them to the ground wire with a wire nut.
Logan OPEN Structure_Grounding No 873612 Alpha One 12 2026-06-17 Install Ground wire. Strip tracer wires and attach them to the ground wire with a wire nut.
Logan OPEN Restoration_Trench No 879390 GTO 12 2026-06-17 Fill hole with flowfill
Logan OPEN Structure_Gravel No 869060 Hughes 3 0 2026-06-29 Lift vault and place a 4 inch base of gravel.
Logan OPEN Structure_Tracer_Wire No 869060 Hughes 3 0 2026-06-29 Strip tracer wires and attach them with a wire nut.
Logan OPEN Structure_Gravel No ECC Ervin 0 2026-06-29 Lift vault and place a 4 inch base of gravel.
Logan OPEN Restoration_Trench No 879390 GTO 0 2026-06-29 Fill trench with flow fill.
Logan OPEN Restoration_Trench No 879390 GTO 0 2026-06-29 Fill trench with flow fill.